Can we have a moment of your time to show how well our software works?
Graham 9-44
August 26, 2016August 26, 2016 Graham partial update 9-44 Removed invalid finishes from finish table
VT Industries (VI Catalog) 2-179
August 23, 2016August 23, 2016 VT Industries partial update 2-179 Corrected two digit VTOL code for BIRCH WH ROT CUT A GR CTRLD WD BK BAL to SP Changed Pionite OILED CHERRY WC421-N to OILED CHERRY WC421-SD
Steelcraft 9-33
August 22, 2016August 22, 2016 Steelcraft partial update 9-33 Added prep for 2 ea 4 1/2″ universal hinges for both doors and frames
Fleming 5-7
August 21, 2016August 21, 2016 Fleming partial update 5-7 (includes 5-6 released for testing) Correction for Dutch Door not validating Added new HW preps at $0.00 for Dutch Door preps included in Dutch Door add. NSHQ,4_DUT – Non Standard Hinge Quantity NSLH_DUT – Non Standard Lock Height
Fleming 5-5
August 18, 2016August 18, 2016 Fleming update 5-5 (includes test release 5-4) Door and Frame Hinge prep modifications Undercuts Organized by HW or HM Prep Ceco, Curries and Pioneer locations added as HM preps
Curries 10-77
August 18, 2016 Curries partial update 10-77 Price correction for 757 Series doors – Pricing updated to price list revised May 2016
Pemko Lites and Louvers (PL) 5-0
August 17, 2016August 17, 2016 Pemko Lites and Louvers complete update 5-0 New pricing effective date 01/01/2016 Total reformat with properties to select finish Accounts with inventory will be required to build new records and make a stock transfer The following link contains instructions on making this change. The instructions are for Anemostat by the process is identical…
Fleming 5-3
August 16, 2016August 16, 2016 Fleming update 5-3 Hinge prep modifications HNG_OPT prep allows the selection of several options where only one option charge applies to all selected STD = 4 1/2″ Standard weight hinge – Nothing prints on PO per Instructions from Fleming HWT = 4 1/2″ Heavy weight hinge – HWT prints on PO NSHS-4…
Fleming 5-2
August 15, 2016August 15, 2016 Assigned missing hardware preps as HW Prep so they would be visible in Default Preps Preps Added to DPS, HM and HW Notes, Undercuts, Door Bottoms, Mail Slots, Roller Latch in top channel, Roller Latch in Lock Edge, SOSS hinge prep per each, Non-Std Hinge Option Combinations – Special location, Size, Heavy…
Curries 10-75
August 12, 2016August 12, 2016 Curries partial update 10-75 Correction for the following CCW material not found by Elevations or by component replacement CCW140E Full Jamb Width Sill/Floor Channel CCW21E Open Plain Rail 1″ thru 1 7/8″ Face CCW23E Open Plain Rail 2 1/8″ thru 3 7/8″ Face CCW117E8 Open Plain Rail 4 1/8″ thru 7 7/8″…

