Can we have a moment of your time to show how well our software works?
Curries Company 12-13 USA
July 24, 2019Correction for Spec Inst Sorting. Change torx screws to door parts from frame parts View Comsense Price Book Status
Ceco Door Products 7-31 USA
July 23, 2019SGLKD DC series added for inventory build.PO Spec Instructions Print Field Fix View Comsense Price Book Status
Ceco Door Products 7-30 USA
July 22, 2019Partial update 7/22/2019 FT Series 14ga added View Comsense Price Book Status
Ceco Door Products 7-29 USA
July 18, 2019SDI Mfgr Locations – Checked all and corrected for others View Comsense Price Book Status
Ceco Door Products 7-28 USA
Partial Update July 18,2019 Added Mag Switch Preps for Strike Jamb, StormPro CRS Fixed, 45H PO Position New mag switch prep example: View Comsense Price Book Status
Ceco Door Products 7-27 USA
June 28, 2019Applied application type to several light kits that were not indicated as such View Comsense Price Book Status
Timely Frames 4-6 USA
June 27, 2019Corrected TA1 ABLK and TA3 ABLK PO description and position. Corrected 430 PS 2 Sides to print on PO View Comsense Price Book Status
Steelcraft 13-4 USA
June 21, 2019Partial Update – June 18/2019 – Prep component pricing review. DW KD and 4 Sided F series correction It was necessary to change the Short Desc for F series four sided frames so these will need to be rebuilt. View Comsense Price Book Status
Ceco Door Products 7-26 USA
June 19, 201912ga frame with H400 head was not validating and has been corrected View Comsense Price Book Status
Steelcraft 13-3 USA
June 13, 2019Partial Update – June /19 – Add missing EMA prep for 8 Anchors, removed OBSOLETE from stainless steel head charges, price corrected VR conc. cable Please note. This update does not include correction for jamb depths over 14 3/4″ View Comsense Price Book Status

