VT Industries (VI Catalog) 2-224
May 9, 2017May 9, 2017 VT Industries update 2-223 and 2-224 ST – Strike Location was set to required and should not have. Changed to not required When a Frame Mfgr is selected from the drop down list hinge and strike locations will be that Mfgr’s standard locations ST, HN, HNE will require user entry to indicate…
Timely Frames 3-50
May 6, 2017May 6, 2017 Timely Frames update 3-50 1″ Unknown Jamb Depth was on working for C series frames. This update resolves that issue.
VT Industries (VI Catalog) 2-222
May 5, 2017May 5, 2017 VT Industries update 2-221 and 2-222 Corrected Pionite laminate from BLACK SE101 – N to BLACK SE101 – SD (2-222 corrected Black SE101 – D to SE101 – SD)
Mohawk Door 3-26
May 2, 2017May 2, 2017 Mohawk Doors 3-26 partial update Removed Edge restrictions for all Moulded Panel Smooth Doors as most were outdated
VT Industries (VI Catalog) 2-220
May 1, 2017May 1, 2017 VT update 2-220 Plain Sliced Natural Maple code updates including reported issue for – MAPLE NAT PL SL (FC) A GR CTRLD WD BK RUN
Ceco 6-51
April 26, 2017April 26, 2017 CRITICAL UPDATE Correction for SLL and SLH special lock an strike locations. There were conflicting attributes where PO printed C/L AFF. Everything should be TOD to C/L of Lock or Strike. Ceco order entry staff have been alerted but you should check any newly placed orders or orders not yet placed to…
Air Louver 9-2
April 24, 2017April 24, 2017 Air louvers partial update 9-2 Updated PAK pricing 800R Louvers are discontinued 700TL standard finish is now gray
Baillargeon 5-2
April 20, 2017April 20, 2017 Baillargeon 5-2 Added 45 to door thickness for 45mm metric doors
Graham 9-49
April 18, 2017April 18, 2017 Graham Door update 9-49 Made max size for GCD series non label doors 50120
Vision Hollow Metal 2-8