Enhancements include:

Note: Additional processing required if  you have not already updated to 1.02.0208, please allow this update to complete - Some hardware options may not have displayed in the Request for Quote or the Purchase Order reports. This update corrects the reporting of the hardware descriptions by rebuilding the inventory descriptions during this update. Due to the rebuilding process the update will potentially be a lengthy process, please do not stop this update.
Opening List - Filter and Replace window – Now allows global replace on degree of opening
Project Setup – Sections Tab – Allow for entering released date and fill in scheduling tab with released flag for products with a required date entered
Complete window – Show sourced flag on opening and individual products – User can double click the Sourced cell of an individual product to display a dialog which shows whether the product needs to be Sourced, Shipped or Invoiced
Blocking situations - Corrected for situations where message boxes were causing blocking
Improved performance in product validation, costing, and on the costing report
Pricing window – Corrected for estimated gross profit to account properly for the estimated cost
Costing Window – Corrected for situation when parts or in-house labor was attached to a door/frame with an adjusted cost – the part was getting the same adjusted cost as the door/frame component next time when pricing was run
Complete window – When copying an opening, in the case where the frame is an elevation, no longer reset the elevation costing flag simply copy the product
Prep defaults – When prep was added and sourced products present, the system was giving unnecessary messages about openings where the added prep was not involved
Door/Frame PO - Corrected door/frame purchase order when product selection is done
Complete Window - Added right click option on door/frame line on a change order to reload original definition of the door/frame
Complete Window – Added right click option for door/frame takeoff global replace on filtered opening list on a change order
Hardware Worksheet – Locks and Exit Devices – Added clear button for clearing out inside design/trim
Specwriter – Pricing Tab – Correction to allow adjustment of previously entered list price on a special product
Project Search Window – User can now set a project to deleted and save change
Product Summary Report - Correction for product listed twice in report

Posted 11-07-2007 1:14 PM by Patrick Teas
Copyright 2008 Comsense Inc. 202-7145 West Credit Ave. Bldg 2, Mississauga, ON L5N 6J7 Tel: 905-542-9300
Powered by Community Server (Non-Commercial Edition), by Telligent Systems