Release 1.03.0365

Enhancements include:

The original security certificate used by the Advantage Microsoft Word add-in has expired. If you have a workstation that has not yet been updated to use the new files, please visit the following link for instructions to do so: http://www.comsenseinc.com/PublicDocs/InstructionsDownloadingInstallingNewCertificate.htm
Frames entered as componoent parts (the default when using HG catalog or a derivative) would not show the frame size in costing summary report
Hardware builder – Correction for split finishes not showing in inventory description
Costing and pricing window – Corrected to hold the adjusted cost on individual frame components
Purchase Order – System verifies that each manufacturer has a supplier assigned for the project's division project is defined under
Costing and Pricing window, Miscellaneous cost – Note is now a required entry
Default Preps – Disabled Hardware Set Tab as soon as headings are built; also the global reapply has been disabled in the same situation to prevent any hardware set specific changes that may have been applied in the past to be lost; individual prep change can still be applied; for heading specific changes user will use the complete opening window and choose to apply to all openings within current heading
Purchase Order report not allowed on openings without a valid hand
Complete Opening window - Hand clear not allowed on openings that have released product
Purchase Order – Corrected for product not showing in the product list after change order(s) have been approved
Customer Master – Customer code cannot be changed on an existing customer
Complete opening window – When adding a new product with a handed option on a handed opening, the system was not calculating a hand initially; opening hand needed to be refreshed
Hardware worksheet – Change has been disabled as soon as the product has been released on at least one opening
Complete Opening window – Corrected to refresh hardware status of locked for update when changing heading number
Complete Opening window – Now prevent user from changing opening type, opening size or building area on an opening that already has a heading number and released hardware product.  A change order will now be required to make these changes.
Costing and pricing window on bulk projects – No longer warn about having to run default preps, as preps can be entered in bulk prep area
Project copy - When option taken to not bring over pricing, quoted consession discounts are no longer copied either
Parts maintenance window – added Ship Separate flag (for use with Enterprise)
Default preps – Exclude change orders and sourced product in prep application
Complete window Filtering window for Change order – Opening dropdown now contains opening list from the current change order
Hardware window, Openings tab – Added feature to save column order and width settings; double-click on the header allows for column reorder and initial values entry
Takeoff entry – Correction for issue with user entered manufacturers where user presented with ‘jamb not within range’ message
Costing and Pricing Window, Miscellaneous Cost – User now advised if duplicate detected
Complete window, hardware section – Corrected for prep selection window to show properly when right-click menu used
Specwriter and Advantage – Added note field in openings grid; width, order and sort of the columns is also saved and retrieved per user
Maintain Openings window from Hardware Sets tab – Allow previously assigned opening to be changed to the current set
Product Notes – Added feature to save product notes globally to be brought over by default in future projects where the product is used
Copy project correction – Elevation’s net cost field was omitted causing the adjusted cost of an elevation not to change accordingly with the change or elevation costing window
Refresh pricing optimized to be more specific to the product being changed, processing time significantly reduced for all user entered catalog changes
Parts and Labor – Added ship separate flag in user entered maintaince windows
Takeoff window – replace line – Correction for treatment of uppercase vs. lowercase
Complete Opening window – Correction for delete opening when Enterprise transactions are present. Sourced flag accuracy also corrected.
Pricing window – When selling a change order, system will now cancel the entire operation if an approval number is not provided
Purchase orders – Correction for situation when purchase order is attempted to be done after at least one change order has been approved – non-purchased products not affected by the change order were not showing in the results
Customer import – Corrected to prevent overwriting of pricing formula if a new one is not provided in the import

Posted 04-11-2008 11:18 AM by Patrick Teas
Copyright 2008 Comsense Inc. 202-7145 West Credit Ave. Bldg 2, Mississauga, ON L5N 6J7 Tel: 905-542-9300
Powered by Community Server (Non-Commercial Edition), by Telligent Systems