| Note: Additional processing required, please allow update to complete - Some hardware options may not have displayed in the Request for Quote or the Purchase Order reports. This update corrects the reporting of the hardware descriptions by rebuilding the inventory descriptions during this update. Due to the rebuilding process the update will potentially be a lengthy process, please do not stop this update. |
| Costing - Certain situations caused costing window to show product that was on the job but later removed |
| Performance - Performance improvements made to Architect Master, Customer Master, and Reports. |
| Complete window – Correction to quantity of hardware prep selected when the application quantity greater than 1 |
| Change Order Selection in Costing – Row select now working properly rather than selecting first unsold change order |
| Project Setup – Sections – Correction for invalid date being saved in date required |
| Product Release - When new product is being added to a product category, automatically release only if release date and require date is populated on the corresponding section |
| Elevations Costing – Refinement for concessions discounts not being brought over when piece replace feature was used |
| Project wizard – When duplicating an estimate project into an estimate, if the user is choosing the option of not bringing over the costing and pricing information, do not copy the sold dates and scheduled ship dates |
| Project Setup - Delivery Scheduling Tab – Show only major product categories per each opening - No longer show door parts or frame parts or other categories of in house labor attached to hardware or doors and frames; these product categories will automatically be considered released when the main shortcode product category is marked as released. |
| Complete Window – Detailing – New check mark indicator to show sourced product. When hovering over an opening it will show the list of product from that opening that has been sourced |
| Internal Change Order - Internal change orders enforce that there is no net contract amount |
| Elevation Costing - Prep selection by group window – Quantity and Unit of Measure now show on in house labor |
| Hardware Description - Correction for situations causing product with multilpe options not including all options in description |
| Elevations Costing - Prep Selection by Group does was not adding Prep to Material List |
| Elevations Costing - Quoted Concession was not shown in Green in Engineering and Preps |
| Elevations Costing - Quoted Concession did not apply to pieces replaced in costing |
| Pricing - Generic Manufacturers no longer require default preps to be reviewed |
| Costing - Allow for discount string and adjusted cost to be changed for products being removed on a change order |
| Hardware on Bulk Estimate - Can now delete a set. |
| Prep Selection - Sized product – Size was not available to be entered when selecting by group |