Enhancements include:

Project Pricing – Correction for Estimated/Detailed cost with setup and non-standard charges
Project Costing – Adjusted column cost now clears and saves properly
Hardware worksheet – Removed ability to create a special product with a blank finish code.
Complete Opening – Corrected for issue raised when trying to assign opening hand before opening type
Change Order – You can now delete a change order for which pricing has already been run
Change Order – Elevation costing now properly assigning elevation shortcode to change order opening
Hardware Notes – Removal of notes with 'This set only' flag checked will now leave the product note on instances of the product in other sets
Complete Opening - Product Notes - Using the option 'To this set only' when entering product notes now prevents the note from applying to all sets
Change Order – Reload original opening feature corrected
Change Order – Approval of change order where keying exists in original opening corrected.
Help – Clicking Help menu item now launches Comsense Opening Suite Online Help system at http://help.comsenseinc.com
Takeoff – Validation process skips sourced product
Change orders – Adding a hardware product caused system to invalidate door and/or frame before preps were even assigned. System will now leave shipped door and/or frame intact
Prep Selection – System now prevents user from selecting in-house labor where there is no price for the project’s division
Project Setup - Estimating – On the Bids tab, when a new bid recipient is added, all sections for the project are added to the sections pane of the window
Labor Master – User can now delete a pricing for a division, and manually add a division using context (right-click) menu
Pricing – Tax exempt on miscellaneous cost now applied to contract amount, rather than just the cost
User Entered Door/Frame - Users can now modify list price of user entered doors and frames in the costing window
Product Category Window – Sort sequence now required
Tax master – Added inactive date
Project Pricing – When rounding, the remainder is allocated to the last group

Posted 09-20-2007 11:34 AM by Patrick Teas
Copyright 2008 Comsense Inc. 202-7145 West Credit Ave. Bldg 2, Mississauga, ON L5N 6J7 Tel: 905-542-9300
Powered by Community Server (Non-Commercial Edition), by Telligent Systems