Some of the enhancements and corrections include:
Discounts window now shows both user entered and Comsense maintained product categories in the drop-down list.
When copying a sold ‘Estimate’ project to another ‘Estimate’ the sold date is not copied. When a sold ‘Estimate’ or ‘Detailed’ project is copied to a ‘Detailed’ project, the user is prompted to remove the sold date (with a default of ‘No’)
‘Estimate’ projects may now be copied into multiple ‘Detailed’ projects
Manufacturer maintenance window no longer allows a space as part of the manufacturer code.
Manufacturer maintenance window no longer allows a space as part of the manufacturer code.
Heading Builder now includes the ‘Heading Description’ and ‘Building Area’ as a basis to segregate headings.
Project Search Result window now includes a status column reflecting ‘sold’ projects and a status column which is set for projects with outstanding tasks. In Estimating, this window now by default excludes sold projects. Deleted projects will be excluded by default as well for both Estimated and Detailed projects. A ‘Show All’ button will include sold and deleted projects.
Default Prep Window – the ‘load from history’ now has an option to selected factory, in-house and/or installation codes. This window now shows the ‘History’ status of the prep and an option to ‘select/de-select’.
Default Prep Window – when property changed, reposition the cursor in the same property column after refresh.
Added 'Pending' flag for the user to identify a tax code as a pending. This flag will be used when invoicing in Enterprise. The invoicing operation cannot proceed where a tax code has the pending flag set to positive.
Corrected for ‘Show Worksheet’ options not recognizing correct setting for new users.
Pricing & Contract window costing process has been enhanced to address slow throughput times. The ‘Product Costing’ tab has also been removed and the ‘Project Pricing’ tab may now be accessed where costing errors or omissions have occurred.
Complete opening windows now have a tool bar icon to show opening product list and cost prices.
Default Preps window now includes a ‘Re-calculate Property Values’ icon. This feature will re-load values for any automatic property values.
‘Frame Takeoff’ ,‘Complete Opening’ and ‘Frame Elevation’ windows attributes for gauge, material, jamb, profile and/or series are now auto-synchronized ,
Elevation Costing will now allow selection of Glazing Bead from manufacturer other than Frame Manufacturer.
Do not allow the user to enter the same opening number in both door and frame takeoff for bulk projects.
When changing a manufacturer code for a frame which has an Elevation that has been 'Costed' and this elevation has been assigned to other openings, prompt user for a new elevation code.
Hardware configured with options other than categories of Fastenings, Cylinders, Finishes, and Keying are now recognized when assigning prep defaults from history
Door & Frame Catalog Maintenance – Door Cost Adds and Frame Cost Adds tab has been removed from these windows. The Mfg Attributes window now has columns to maintain attribute specific pricing information.
Complete Opening window history window format has been modified with an extended filter option.