This update includes the following changes
Added new anchor code
N22 ATA Adjustable “T” Strap and Yoke Anchor
Frame Prep Class corrected for the BJ3/4, BM3/4 and BJ1 so they will price properly
Setup Charges
Setup charges where applicable are now built into the specific prep. For example if you have 5 doors types N29, Non-Std Location Sandwich Kit with Channel and all 5 are at the same location you will on select N29 under Door Type table. The setup charge will apply for only one special location at $25.00. For a N29 at a different location than the 5 above, the rule is applied again and another charge of $25.00 will be added and so on for each different location. Setup charges have been removed from the Setup Charges table and are no longer required.
Door Table Changes - Added the following tables
Preps moved from HINGE table to the following table
HNG_EXRA Special Location, Backset, etc
F8 Non Std Hinge Location
F9 Non Std Backset – 1/4 Std
F98 Arc Weld Reinforcement - Each
Preps moved from LOCK table to the following table
LOCK_EXTRA Special Location, Backset, etc
I6A Non Std CYL Lock Location
I6C Non Std CYL Deadlock Location
I7 Non Std Lock Backset – 2 ¾ Std
J7A Non Std Mortise Lock Location
J7B Non Std Mortise Deadlock Location
K8 Non Std Mortise Exit Dev Location
L7A Non Std Strike Location
L7B Non Std Deadlock Strike Location
Frame Table Changes - Added the following tables
Preps moved from HINGE table to the following table
HNG_EXRA Special Location, Backset, etc
F8 Non Std Hinge Location
F9 Non Std Hinge Backset – 3/8 Std
F23 Box for Elect Prep with Connector
F98 Arc Weld Reinforcement
Preps moved from LOCK table to the following table
LOCK_EXTRA Non Std Location, etc
G7A Non Std Strike Location
G7C Non Std Deadlock Strike Location
G98 Arc Weld Reinforcement – Each
Added Mullion Filler FG1, FG2, FG3, FG4 to frame PARTS table